Index

EG

Electrical noise 2-3

Electrostatic discharge (ESD) 2-28Environmental requirements 2-3ESF T1 CSU. See “Channel service

unit (CSU)”

Expansion carrier, installing 2-26Extended superframe format

(ESF) 4-17Extensions, labeling 3-38

F

Failed tests 7-10Fax machine 8-27connecting 3-18

Feature module installing 2-43replacing 2-45,7-6,7-8

Field labels 3-67

551 T1 CSU. See “Channel service unit (CSU)”

Foil shield 2-37Forms

system 1-3400EM modules 2-56

Framing format, ESF T1 4-22Frequency generator, 129B 2-30Frigid start 7-6,7-9

General Purpose Adapter (GPA) 3-15

Ground bar 2-6,2-7Grounding- 2-6

146A 2-15

147A 2-15providing 2-52requirements 2-6,2-11

Grounds, approved 2-13Ground-start trunks, testing 4-15,

7-15Group calling

testing 7-23

delay announcements 3-18

H

Headsets adapters 3-19amplifiers 3-19

Housing clips 2-21

I

InnManager Guest Management System 8-16

Insert labels 3-67Installation overview 1-2Integrated Solution Ill (IS-III) 8-18Interconnect wiring 3-48

IROB 3-45

Index IN-3

Page 377
Image 377
AT&T Release 2.0 manual