Initializing and Testing the System

5 .

6 .

Perform a frigid start:

This step ensures that all system programming is returned to default values.

To upgrade to Release 1.1, Use the System Erase function on the SPM Maintenance menu (Maintenance Slot 00 Demand Test System Erase).

To upgrade to Release 2.0, use the System Erase function:

Maintenance Slot 00 Demand Test System Erase (Line 5, left button) twice Yes

See the Maintenance and Troubleshooting guide for additional information on System Erase.

Restore from a Release 2.0 system programming diskette as described earlier in this chapter under “Restoring from the System Programming Diskette.”

7 . Program new features, if necessary.

See the System Programming guide for detailed procedures on programming.

8 . Replace the control unit housing when finished upgrading.

See Chapter 2 for any additional instructions.

Setting the Time and Date

If the Control Unit Diagram indicates that the time and date should be set, do so before testing the system.

Quick-Reference Procedure

Menu SysProg System Date Drop Dial current date Enter

See one of the programming guides for any additional instructions.

Setting the Time and Date 7-9

Page 286
Image 286
AT&T Release 2.0 manual Setting the Time and Date, Quick-Reference Procedure