Installing the Control Unit

9.Connecting the control unit to AC power

10.Powering up the system

11.Powering down the system

Be sure to follow these procedures in the order specified.

Preparation

The control unit must be installed on a backboard, which may already be installed. If so, skip to the section, “Power and Grounding.”

If backboard installation is your responsibility, follow the procedures in this section.

Environment

The placement of the control unit requires careful consideration. Make sure you install the backboard in an area that meets all of the environmental requirements listed in Table 2-1.

2-2Preparation

Page 41
Image 41
AT&T Release 2.0 manual Preparation, Environment