Installing the Control Unit

2

If you have not read Chapter 1, do so before continuing with any instructions in this chapter.

Overview

Installing the control unit involves the following, which this chapter describes in detail:

1.Installing the backboard

2.Meeting the power and grounding requirements

3.Checking the total unit load

4.Installing the basic carrier

5.Installing any expansion carriers specified for the system

6.Installing the power supply

7.Installing the processor

8.Installing the trunk/station modules

These are referred to as modules throughout this guide.

Overview 2-1

Page 40
Image 40
AT&T Release 2.0 manual Installing the Control Unit, Overview