Initializing and Testing the System

Testing the DID Trunks

Follow these steps to test the DID trunks:

1 . Work with the central office to check all the DID trunks or have someone call from the outside to check each DID trunk.

2 . When the first trunk rings, answer it.

3 . Instruct the caller to put the call on hold or put down the handset while making the next call.

4 . When the next trunk rings, put the previous call on hold and repeat this procedure until all eight DID trunks have successfully connected.

5 . When all trunks have connected with good communication, disconnect each call, and have the caller do the same.

7-16Testing the System

Page 293
Image 293
AT&T Release 2.0 manual Testing the did Trunks