Avaya CMC1 manual Installing a J58890CG Power

Models: CMC1

1 370
Download 370 pages 26.18 Kb
Page 15
Image 15

 

Contents

Installing a J58890CG Power

 

Distribution Unit

296

Mounting without a backing plate

296

Mounting with a backing plate

296

Install terminal server

297

Installing and administering the terminal server

297

Making the connections

299

Administering the IOLAN+

301

Potential failure scenarios and repair actions

308

Administering IP node names

309

Administering IP services

309

Install Call detail recording (CDR)

311

Connecting CDR Equipment

311

Administering CDR Data Collection

311

Administering CDR parameters

312

Testing the switch-to-adjunct link

313

Install Reliable Data Transport Tool (RDTT) Package

314

Contents of the RDTT

314

Downloading the tool

314

Installing RDTT

315

Administering RDTT

315

Related Topics

315

Install wideband endpoints

315

Nonsignaling configuration

315

Signaling configuration

316

Install multimedia call handling (MMCH)

318

Connect the endpoints

319

Administer the system

319

Administer the endpoints

320

Administer one number complex

320

Expansion services module

320

ESM installation

321

Administration

321

Place test call

322

Troubleshooting

322

Connect printers

323

Connecting printers using TCP/IP

323

Task list

323

Administering adjunct parameters

323

Issue 10 June 2005 15

Page 15
Image 15
Avaya CMC1 manual Installing a J58890CG Power