TeamPoS 3000 XL and XL2

Installation

2. Place the 133UQ or 133AU keyboard on the ledge for the keyboard,

Stacked LCD

Back of 133UQ Keyboard

Filler Bracket

Keyboard Cable

3.Run keyboard cable under the Central Filler. The keyboard cable should be positioned behind the Central Filler bracket as shown. Do not seat the keyboard on the bracket until the LCD, filler(s) and LCD are installed.

D900000145

Issue 3

5-76

Page 122
Image 122
Fujitsu 3000 XL manual