TeamPoS 3000 XL and XL2 | Site Preparation |
Chapter 4 SITE PREPARATION
This chapter defines the following
•Shipment inspection and return
•
•Electrical supply requirements
•Mains power cables
•Warning labels
•The procedures assume that
4.1Unpacking/Inspecting the Shipment
TeamPoS Series terminals are thoroughly inspected prior to shipment; however, damage can occur during transit. Any damage to the terminal can lead to problems after installation. Before accepting a shipment, inspect all shipping containers for external damage. Ensure that all packages listed on the shipment billing form have been delivered.
•Verify that all the accessories listed on the packing list have been included in the shipment. If components are missing, contact your Help Desk for instructions. Then report shortages and damage to Customer Care. The customer needs to provide the sales order number and a description of the piece of equipment damaged. The customer should then telephone
•Inspect the exterior of each shipping box noting damage on the shipping documents so that the carrier has a record. Remove the unit and components from the box and check for damage. If the unit or components are damaged, contact your Help Desk for instructions.
•Inspect the exterior of each unit for any obvious physical damage (scratches or abrasions on painted or display surfaces, or on plastic surfaces) that could have occurred during shipping.
•Damaged equipment received from a source other than Fujitsu Transaction Solutions Inc.’s Foothill Ranch facility should be reported to the sender.
D900000145 | Issue 3 |