Strata CTX670 Installation

Install Reserve Power

RWBFs are used on left and right sides, wherever indicated

 

 

RWBF

RWBF

A

B

 

 

RWBF

A B

RWBF

A B

“A” Front two screws, left and right sides

“B” Back two screws, left and right sides

BFIF

RWBF

AB

A B

RWBF

BFIF

AB

A B

A B

RWBF

RWBF

RWBF

BFIF

AB

A B

A B

A B

A

B

A

B

RWBF

RWBF

A

B

A

B

RWBF

 

BFIF

 

A

B

A

B

RWBF

AB

A B

RWBF

BFIF

5007

BFIFs are used on left and right sides, wherever indicated

Note RWBF (3-pairs) and BFIF Stands (1-pair) are supplied with floor installation kit BFIF.

Figure 4-20 Floor Mounting Cabinet Installation

Bolt Cabinets to Concrete Floor

1.Mount the CTX670 Base Cabinet on Floor Mount Fixtures (see Figures 4-19and

4-21). Position the Base Cabinet at the selected installation location.

2.Mark the floor where holes will be drilled. Move the Base Cabinet prior to drilling.

Note Cover the Base Cabinet with a drop cloth to protect the power equipment from dust created during drilling.

3.Use a hammer drill to make holes for 3/8- inch bolt anchors.

Bottom

Cabinet

BFIF (Floor

mount

Bolt

fixture)

Lockwasher

Concrete

Bolt Anchor

 

Floor

Plug

5242

4. Install the bolt anchors, with plugs, in the

drilled holes.

Figure 4-21 Installation on Concrete Floor

 

5.Using the driving tool and a hammer, drive each bolt anchor into the floor.

6.Move the Base Cabinet into position on the equipment room floor.

7.Secure the Base Cabinet to the floor using bolts, lock washers, and flat washers.

4-36

Strata CTX I&M 06/04

Page 162
Image 162
Toshiba CTX28 manual Bolt Cabinets to Concrete Floor, Drilled holes