Strata CTX670 Installation

Install Reserve Power

Cabinet AC Power Component Installation

After the cabinets have been floor mounted, the AC power components should be installed. Tables 4-7and 4-8show the primary AC power components required for floor mounted systems.

Table 4-7

Floor Mount Cabinet Component Requirements for 120VAC Primary Power

 

 

 

 

 

 

 

 

 

 

 

 

Local

 

 

 

 

 

Cabinets

 

 

 

 

Electrical

 

 

 

 

 

 

 

 

 

 

 

1

2

3

 

4

 

5

6

7

Code

 

 

 

Three or more

 

 

 

1 -BCCB1201

1

– BCCB1201

1

– BCCB1201

 

 

cabinets

 

1 – BFIF

1 – BFIF

1

– RPSB2

2

– RPSB2

N/A

N/A

require a

 

1 – BFIF

 

 

 

1

– BFIF

1

– BFIF

 

 

conduit box

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.A BCCB120 conduit connection box must be installed and wired by a certified electrician per the local electrical code (see Figure 4-24).

Table 4-8

Floor Mount Cabinet Component Requirements for 208VAC or 240VAC Primary Power

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Local

 

 

 

 

 

 

 

Cabinets

 

 

 

 

 

 

Electrical

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Code

1

 

2

 

 

3

 

4

 

5

 

6

 

7

Two or more

 

1

– BCCB240

1

1

– BCCB2401

1

– BCCB2401

1

– BCCB2401

1

– BCCB2401

1

– BCCB2401

cabinets

1 – BACL240

 

1

– BPSB240

1

– BPSB240

2

– BPSB240

2

– BPSB240

3

– BPSB240

2

– BACL240

 

require a

1 – BFIF

 

3

– BACL240

4

– BACL240

5

– BACL240

6

– BACL240

7

– BACL240

1

– BFIF

 

conduit box

 

 

1

– BFIF

1

– BFIF

1

– BFIF

1

– BFIF

1

– BFIF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.A BCCB240 conduit connection box must be installed and wired by a certified electrician per the local electrical code (see Figure 4-25).

Installation

Strata CTX670

Strata CTX I&M 06/04

4-39

Page 165
Image 165
Toshiba CTX28 manual Three or more BCCB120 Cabinets Bfif