Strata CTX670 Installation

Install Reserve Power

Bolt Cabinets to Wooden Floor

1. Mount the CTX670 Base Cabinet on Floor Mount Fixtures (BFIF). See Figures 4-19and 4-20.

2. Position the Base Cabinet at the selected

Base

 

installation location.

Cabinet

 

3. Mark the floor where holes will be drilled.

BFIF

 

Move the Base Cabinet prior to drilling.

(Floor

 

mount

Bolt

 

Note Cover the Base Cabinet with a drop cloth

fixture)

Lockwasher

 

to protect the power equipment from

 

 

dust created during drilling.

 

Wooden

4. Drill pilot holes to make insertion of 3/8

 

Floor

 

1468

inch lag bolts easier, and to prevent splitting

 

 

 

of wood flooring.

Figure 4-22 Installation on Wooden Floor

5.Move the Base Cabinet into position on the equipment room floor.

6.Secure the Base Cabinet to the floor using lag bolts, lock washers, and flat washers.

Bolt Cabinets to Computer Room Floor

1.Mount the CTX670 Base Cabinet on Floor Mount Fixtures (BIMF). See Figures 4-19and 4-20.

2.Position the Base Cabinet at the selected installation location.

3.Mark the floor where holes will be drilled. Move the Base Cabinet prior to drilling.

Note Cover the Base Cabinet with a drop cloth to protect the power equipment from dust created during drilling.

4.Drill holes through tile for 3/8-inch threaded rods.

5.After the tiles have been drilled, insert threaded rods through the holes in the tile and mark the concrete floor directly beneath the holes in the tiles.

6.Remove the tiles. Use a hammer drill to make holes for 3/8-inch bolt anchors.

7.Install the bolt anchors with plugs in the drilled holes.

8.Using the driving tool and a hammer, drive each bolt anchor into the floor.

9.Screw threaded rods into each bolt anchor.

10.

Install a hex nut, lock washer, and flat

 

washer on each threaded rod. Screw the

 

nuts down far enough to allow floor tiles to

 

be replaced over the threaded rods.

11. Replace tiles over threaded rods in their

 

original positions on the floor.

12.

Reach under the tiles, and screw the hex

 

nuts upward until the flat washers are

 

touching the bottom of the tile.

Bottom

Cabinet

BFIF (Floor mount fixture)

Flat Washer

Lock Washer

Hex Nut

Floor Tiles

Lead Anchors

Concrete

1469

Figure 4-23 Installation on Computer Room

13.Use a hack saw to cut the threaded rods at a

height of approximately 1.5 inches above the floor tile.

14.Move the Base Cabinet into position over the threaded rods.

Strata CTX I&M 06/04

4-37

Page 163
Image 163
Toshiba CTX28 manual Bolt Cabinets to Wooden Floor, Bolt Cabinets to Computer Room Floor