Worksheet 6: Strata CTX670 Cabinet Slots

PCB Placement Guidelines

Install the RRCU PCBs in the Base Cabinet first. Station, line and option PCBs can be mixed in cabinets in any pattern. Do not skip slots except for vacant slots that provide RDTU, BPTU or RPTU capacity. Also, do not skip slots except for vacant slots that provide for BBKU/BDKS with Speaker OCA. Refer to Tables 2-54and 2-55. Toshiba recommends placing the RDTU, BPTU or RPTU, BWDKU and BDKU/BDKS PCBs first because they have special placement rules. Use the following numbered sequence as a guide to installing the PCBs.

Important! When placing PCBs, do not install more than five BWDKU or BDKU/BDKS PCBs in the same cabinet. Five BWDKU or BDKU/BDKS PCBs support 80 digital telephones, which brings the cabinet power factor to 82.25. Adding more PCBs of any type to a cabinet that has five BWDKU or BDKU/BDKS PCBs may cause the cabinet to exceed its power factor (85 max.). See Worksheet 7.

Step 1: Processor PCBs

BCTU (slot B102) or the older BECU (Slot B101)/ BBCU (slot B102), are required for system operation.

The BCTU will support up to two cabinets without the BEXU. With the BEXU, up to 7 cabinets are supported.

The BECU/BBCU supports up to two cabinets without the BEXS/BBMS expansion subassemblies. BEXS and BBMS subassembly PCBs are required for 3 to 7 cabinet systems.

BSIS subassembly PCB is required for SMDR and/or SMDI or Toshiba Proprietary Voice Mail RS-232 interface.

Note The BECU/BBCU and BCTU is licensed for 64 ports and four DTMF receivers from the factory. If more capacity is required additional licenses must be uploaded to the processor. See “Worksheet 9 – Software Licenses” on page 2-54.

Step 2: Remote Cabinet PCBs

RRCU PCBs installed in the main location must be placed in Base Cabinet slots S102~S108 in any order. Before installing other PCBs make sure there is a Base Cabinet slot available for each RRCU PCB needed. An RRCU may occupy a vacant slot adjacent to RDTU, BPTU or RPTU. An RRCU PCB in a remote location can support one or two remote cabinets and can be installed in any slot of either cabinet.

The number of RRCU PCBs required in the Base and Remote Cabinet locations is shown in Table 2-52:

Table 2-52 Main Processor PCB/ Remote Cabinet Configuration

RRCU PCBs

Remote Cabinet Configuration

RRCU PCBs Needed at

Needed in

Remote Location (s)

Base Cabinet

 

 

 

1

1 or 2 Remote Cabinets in one location

1

 

 

 

2

2 to 4 Remote Cabinets in two locations or 3 to 4 Remote

2

cabinets in one location.

 

 

 

 

 

3

3 cabinets if cabinets are in separate remote locations.

3

 

 

 

4

4 cabinets if cabinets are in separate remote locations.

4

 

 

 

5

5 cabinets if cabinets are in separate remote locations.

5

 

 

 

6

6 cabinets if cabinets are in separate remote locations.

6

 

 

 