Install a certificate from a PKCS #12 file onto WX switches.
(See “Distributing Certificates to WX Switches” on page 372.)
Add a WX switch to the network plan by copying its configuration from a live switch in the network.
(See “Adding a Switch by Uploading its Configuration from the Network” on page 163.)
Lists the tasks performed using the Devices tab.
(See “Viewing the Operation Log” on page 358.)
Cancels a scheduled task, such as an image deployment.
(See “Canceling a Scheduled Operation” on page 358.)
(See “Enabling or Disabling Management of a Switch by 3WXM” on page 357.)

Devices Tab 349

Table 24 Devices Tasks (continued)

Task

 

 

Task Option Group

Task

Description

Device

Actions Reboot

Operations,

WX and

cont.

APs

Reboot a WX switch and the MAPs it is managing.

(See “Rebooting WX Switches or MAP Access Points” on page 356.)

Reboot

Reboot MAPs.

APs

(See “Rebooting WX Switches or MAP Access

 

 

Points” on page 356.)

 

 

Manage

Enable 3WXM management of WX switches.

Device

(See “Enabling or Disabling Management of a

 

 

Switch by 3WXM” on page 357.)

Unmanage Disable 3WXM management of WX switches. Device

Distribute

Certificates

Other Upload

WX

View

Operation

Log

Cancel

Scheduled

Operation

Page 349
Image 349
3Com 3CRWX120695A WXR100, 3CRWXR10095A, WX4400 3CRWX440095A WX1200 manual Task Task Option Group