Generating a Work Order 399
Scroll down to view the MAC address assignments for the LOS points.
Use the instructions in the Ekahau Site Survey Initial Setup section of the
work order to set up the survey.
When you import the floor map into the site survey tool, make sure you
use the map name specified in the work order. The site survey data will
not appear when you import RF measurements into 3WXM unless the
map name is correct.
Generating a Work Order
A work order provides all of the necessary information for the physical
installation of the 3Com Mobility System. A work order shows where the
MAP access points should be installed, WX initial setup configuration
information, and projected RSSI information that is useful when verifying
the installation.
The work order has meaning only after you add planning information.
(See “Planning the 3Com Mobility System” on page 69.)
1Select the Reports tool bar option.
2In the Report Category list, select RF Plan Reports.
3In the Reports list, select Work Order.
4Select the scope for the work order. You can select the network plan, a
site, a building, or an individual floor.
5Select the options you want to use for the report:
RF Coverage
RSSI Projections
Show Disabled MAPs (only available if RSSI Projections is selected)
Show RF Coverage On Entire Floor (only available if RSSI
Projections is selected)
Show Unreachable MAPs (only available if RSSI Projections is
selected)
Show MAPs on Other Floors (only available if RSSI Projections is
selected)
6Select the language:
English
German