Preparing to Install Options

Preparing a Tower Model

The hard disk drives in Netfinity 5000 server are hot-swappable. If you installing only a hard disk drive (bays 1 through 5), go directly to Removing Internal Drives” on page 56. Otherwise, continue with the followin steps.

1. If you have a modem or fax machine attached to the server, di telephone line from the wall outlet and the server.

Note: If you are in the United Kingdom, you must perform this ste disconnecting the power cord.

6

CAUTION:

 

 

 

 

 

 

 

 

 

 

 

 

The Power-on switch

on

the

front

of the server

does

not

turn off the

electrical

current

supplied

to

the

server.

The server also might

have

more

than

one

power

cord.

To

remove

all

electrical

current

 

from

the

server,

ensure

that

all

power

cords

are

disconnected

from

the

power

source.

 

 

 

 

 

 

 

 

 

 

2. Unplug

all

power

cords

(cables)

from

electrical outlets, and then d

other cables from

the

back

of

the

server.

 

3. Open the server door, if you have not already done so.

4.Remove the left-side cover.

a. Locate the cover-release lever on the front of the server and right.

Cover

Release

Lever

b. Slide

the left-side cover back about 25 mm (1 inch); then, lift

remove

it.

c. Store the cover in a safe place.

44 Netfinity 5000 Server Hardware Information and Procedures

Page 54
Image 54
IBM 5000 manual Preparing a Tower Model, Front Server Does Not Turn off, Server also might, That All, From