Completing the Installation

Attention:

Be sure

to

maintain

a

clearance

of at

least 127 mm (5 inches) on t

rear of

the

server

to

allow for

air

circulation.

5.Reconnect the cables to the back of the server; then, plug the p properly grounded electrical outlets.

6.If you have a modem or fax machine attached to the server, rec

telephone line to the wall outlet and the server.

What to do next

When you have completed installing the covers and cables, go to “Upda Server Configuration” on page 82.

78 Netfinity 5000 Server Hardware Information and Procedures

Page 88
Image 88
IBM 5000 manual What to do next