HP Rack and Power Manager Software, Power Proter Software manual Operation

Models: Power Proter Software Rack and Power Manager Software

1 181
Download 181 pages 43.79 Kb
Page 141
Image 141

Operation

To configure the shutdown timings for servers (attached agents):

1.Select the server you want to configure by clicking its name in the top left corner of the box.

NOTE: Select a load segment, and deselect Infinite to make individual server settings for that load segment.

NOTE: If no load segment is selected, the information at the bottom of the box is not displayed.

2.Enter the number of minutes that should elapse from the time of the power failure to the beginning of the operating system shutdown.

3.Enter the number of minutes needed to completely shut down the operating system.

4.Click Submit to save the changes, click Cancel to reject all changes and keep the box open, or click View Restart Settings to display the Restart Settings box.

5-28

HP Rack and Power Manager User Guide

Page 141
Image 141
HP Rack and Power Manager Software, Power Proter Software manual Operation