1 Welcome to Advanced PC Configuration
Uniform Engineering Environment
The PC station is handled just like a SIMATIC S7 controller during project engineering with STEP 7 / NCM PC: You connect the S7 stations and PC stations to the network in the network view and specify communication connections.
The project engineering data is downloaded to the stations at the touch of a button. With PC stations, you have two options:
SRemote Configuration and Download:
Direct initial configuration or modification of a configuration and transfer of project engineering data to an (online) PC station over an Ethernet adapter.
SLoad a PC Station (XDB import)
In this situation, project engineering data is saved to a file and can be imported into the PC station using any method of data transfer (applies to PROFIBUS and Ethernet).
Project engineering tool STEP 7 /
NCM PC
SDownload
SRemote Configuration / Download
SLoad a PC Station (XDB import)
Virtual rack in the PC station