16 Configuration Console Tool

16.2.3Activating Configured Protocols Step by Step

By configuring a DP master system and connections, you specify which protocols will be used by the OPC Server.

During the commissioning of a system, it is sometimes useful to commission the protocols individually one after the other. With the procedure described below, you can first deactivate the configured protocols and then activate them again step by step.

If you change the configuration, the manual protocol selection will be replaced by the automatic selection again.

Follow the steps below to activate the configured protocols step by step.....

1

Activity

Open the “Applications” folder in the navigation area.

Select “OPC Settings”.

Click on the “Select OPC protocol” property.