![](/images/new-backgrounds/1203826/203826361x1.webp)
13 SIMATIC NCM PC Project Engineering Tool
Follow the steps below:
1.
Follow the steps outlined below:
To create inputs and outputs in the project engineering, select universal modules under ”PC station as DP slave” in the catalog and insert them in the list.
2.
By double
Commissioning PC Stations - Manual and Quick Start | 181 |
Release 5/2005 |