7 Example — OPC Application for Industrial Ethernet

7.4Configuring the PC Station

Overview

After starting the PC station, after installing the software and installing the CP 1613, the CP 1613 is in PG operation.

Handling the Project Engineering Data

Depending on the case, two situations must be distinguished (see Section 2.2):

SProject engineering before initial configuration - XDB file available

SInitial configuration not dependent on project engineering

In this example, we assume that the project engineering data is available in the form of an XDB file that was created on an external engineering station. The XDB file is transferred to the local PC station on a data storage medium. The initial configuration is then done with “Import station” (XDB import) in the Station Configuration Editor.

To allow the information from the project engineering to be transferred from the engineering system to the PC station, the local configuration must match the configuration data entered in the project engineering.

86

Commissioning PC Stations - Manual and Quick Start

Release 5/2005

C79000-G8976-C156-07

Page 86
Image 86
Siemens C79000-G8976-C156-07 quick start Configuring the PC Station, Overview, Handling the Project Engineering Data