7 Example — OPC Application for Industrial Ethernet

7.3Creating the STEP 7 Project

7.3.1STEP 7 Project Engineering on a Central Engineering Station

In the requirements, we have already said that you require a STEP 7 project for this example. Below, you will find a brief outline of how such a project is created.

Activity

1.Create a project in the SIMATIC Manager.

2.Insert a SIMATIC 400 station and a SIMATIC PC station.

3.Create the hardware configuration including the network assignment and parameter settings of the CPs.

4.Save and compile the configuration.

Result: The current configuration is saved in the project, system data blocks are created, the XDB file is created and any system errors are displayed.