2 Getting Started “Configured Mode”
Where to go from here - optional activities
Once the project engineering configuration has been accepted, the PC station is operational. The following steps allowing the use of symbols, diagnostics, and calling the OPC Scout are optional. You should, however, check that the modules in your PC station are operational using the diagnostic functions.
Commissioning PC Stations - Manual and Quick Start | 33 |
Release 5/2005 |