2 Getting Started “Configured Mode”
33
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156- 07
Where to go from here - optional activities
Once the project engineering configuration has been accepted, the PC station is
operational. The following steps allowing the use of symbols, diagnostics, and
calling the OPC Scout are optional. You should, however, check that the modules
in your PC station are operational using the diagnostic functions.