A

Access points, 229 configuring, 53

Advanced PC Configuration, 13 SIMATIC NCM PC, 18 supported modules, 13

C

Characteristics, 13

Compatibility, SIMATIC NCM PC and STEP 7, 163

Configuration

DP master system, 171 PROFINET IO system, 173

Configuration Console, 18, 203 Configured mode, 19

commissioning, 22 getting started, 26

Configuring connections, how to, 175 Configuring connections; target station

proxy object, 176

S7 station; making a copy, 176 unspecified, 176

Connection type FDL, 60

ISO transport, 63 ISO-on-TCP, 63 S7, 62

CP 1613, 226, 235 CP 1616

configuring, 72 controller, 69, 72 controller + device, 75 device, 70, 74 initialize, 71

installing Linux drivers, 77 PROFINET IO test program, 78

Downloading project engineering data, online mode - networked, 184

DP master system, 171

E

Engineering station, 13

F

Features, 13

I

Index, 17

Industrial Ethernet, using older product versions, 281

Industrial Ethernet communication with OPC Commissioning Wizard, 151 hardware installation, 81

OPC Scout, 90 software installation, 81

Information service, 18, 213 Initial configuration, 34, 154 remote configuration, 161

with XDB file, 22, 23, 37, 161 without XDB file, 24, 39

Installation and Commissioning, guide to , 19 Installing hardware (PC modules), 26 Installing SIMATIC NET PC software, 26 Items, 47

L

Loading configuration data, online mode - local, 186

Loading project engineering data, XDB import, 156

D

Databases, 280 LDB, 14, 278 XDB, 279

DCOM, 252 DCOM settings, 18

Diagnostics, with “Configuration Console”, 233 Download, 16, 184

298

M

Master, 171

Mode of a module, 224

Module, accessibility, 158

Commissioning PC Stations - Manual and Quick Start

Release 5/2005

C79000-G8976-C156-07

Page 298
Image 298
Siemens C79000-G8976-C156-07 quick start