Siemens C79000-G8976-C156-07 quick start Examples

Models: C79000-G8976-C156-07

1 300
Download 300 pages 4.08 Kb
Page 9
Image 9

 

 

Contents

5.5.1

Significance in SIMATIC NET

65

5.5.2

SNMP Traps

66

6 Using the CP 1616 as a PROFINET IO Controller/Device

68

6.1

Initialize CP 1616 (IP address and device name)

71

6.2

Configuring the CP 1616

72

6.3

Example: Installing Linux Drivers (Suse Linux 9.2)

77

6.4

installing the PROFINET IO Sample Program (Suse Linux 9.2)

78

Examples

 

 

7 Example — OPC Application for Industrial Ethernet

79

7.1

Overview

79

7.2

Hardware and Software Installation

81

7.3

Creating the STEP 7 Project

82

7.3.1

STEP 7 Project Engineering on a Central Engineering Station

82

7.3.2

Using Symbol Files

83

7.4

Configuring the PC Station

86

7.5

Using the OPC Scout

90

7.5.1

Establishing a Connection to the Server

90

7.5.2

Inserting a Group and Variables

91

7.5.3

Displaying and Modifying Values of Variables

93

8 Example — OPC Application for PROFIBUS-DP

94

8.1

Overview

94

8.2

Hardware and Software Installation

96

8.3

Configuring the PC Station

97

8.4

Changing the configuration on the PC station

100

8.4.1

Changing the Hardware Configuration - Preparations

100

8.4.2

Inserting a DP Master System

102

8.4.3

Inserting a DP Slave

103

8.5

Using the OPC Scout

105

8.5.1

Establishing a Connection to the Server

105

8.5.2

Inserting Groups and Variables

106

8.5.3

Displaying and Modifying Values of Variables

107

9 Example — Unspecified Connection from a PC Application

109

9.1

Overview

109

9.2

Installing the Software

110

9.3

Configuring the PC Station

111

9.4

Creating, Editing and Downloading a STEP 7 Project

116

9.4.1

Creating a New Project

116

9.4.2

Edit the Network and Connection Project Engineering Data

118

9.4.3

Downloading the Project Engineering Configuration

124

Commissioning PC Stations - Manual and Quick Start

 

Release 5/2005

 

9

C79000-G8976-C156-07

Page 9
Image 9
Siemens C79000-G8976-C156-07 quick start Examples