2 Getting Started “Configured Mode”
3
How to Make the ”Initial Configuration with an XDB File”
If you want to prevent project engineering data from being transferred online at a later point in time, select the “Work offline...” option...”. The default is that project engineering data can be transferred online.
Result:
PC station is ready for productive communication
SModule addresses are set;
SCommunication connections configured in the project engineering are established;
SVariables can be accessed using symbols configured in the project engineering.
Tip:
You can also follow this procedure in the example “OPC Configuration for Industrial Ethernet” in this manual; see Section 7.
Where to we go from here?
you can now use the other tools from SIMATIC NET for diagnostics, commissioning, and testing.
See also Section 1.3.