![](/images/new-backgrounds/1203826/203826299x1.webp)
11 Example — PROFINET Communication with OPC
Procedure for “Initial Configuration”
1.
Start the Station Configuration Editor by selecting it in the start menu (Start " Station Configuration Editor).
2.Click the “Import Station” button, select the XDB file that you want to import and confirm the dialog with “OK”.
3.Check whether the settings of the module match the local configuration.
Note
To operate PROFINET, no STEP 7 project engineering data is necessary on the PC station.
150 | Commissioning PC Stations - Manual and Quick Start |
Release 5/2005 |