Siemens C79000-G8976-C156-07 quick start Steps in Project Engineering

Models: C79000-G8976-C156-07

1 300
Download 300 pages 4.08 Kb
Page 30
Image 30

2 Getting Started “Configured Mode”

Steps in Project Engineering

5.

6.

Save the configuration.

(omitted if data entered by the PC Station Wizard)

Change to NetPro to network the station and to create the connections in the project engineering.

30

Commissioning PC Stations - Manual and Quick Start

Release 5/2005

C79000-G8976-C156-07

Page 30
Image 30
Siemens C79000-G8976-C156-07 quick start Steps in Project Engineering