Model 9110T NOx Analyzer

Instrument Maintenance

Figure 11-5: NO2 Converter Assembly

10.Wrap the band heater around the new replacement converter cartridge and tighten the screws using a high-temperature anti-seize agent (TAI P/N CH42) such as copper paste.

Ensure to use proper alignment of the heater with respect to the converter tubes.

11.Replace the Moly converter assembly by routing the cables through the holes in the converter housing and reconnecting them properly.

12.Reconnect the steel cable clamp around the power leads for safe operation.

13.Reattach the tube fittings to the converter and replace the Moly insulation (top layer and corner cut out layers).

14.Reinstall the converter assembly cover.

Teledyne Analytical Instruments

253

Page 253
Image 253
Teledyne 9110T instruction manual Teledyne Analytical Instruments 253