Teledyne 9110T 12.8.2. O3 Generator Replacement, Sample and Ozone Perma Pure Dryer Replacement

Models: 9110T

1 378
Download 378 pages 16.38 Kb
Page 309
Image 309

Model 9110T NOx Analyzer

Troubleshooting & Service

5.Remove the nylon standoff clip that mounts the DOM over the CPU board, and lift the DOM off the CPU. Do not bend the connector pins.

6.Install the new Disk-on-Module, making sure the notch at the end of the chip matches the notch in the socket.

7.It may be necessary to straighten the pins somewhat to fit them into the socket. Press the chip all the way in.

8.Close the rear panel and turn on power to the machine.

9.If the replacement DOM carries a firmware revision, re-enter all of the setup information.

12.8.2.O3 GENERATOR REPLACEMENT

The ozone generator is a black, brick-shaped device with printed circuit board attached to its rear and two tubes extending out the right side in the front of the analyzer (see Figure 3-5). The board has a red LED that, when lit, indicates ozone is being generated. To replace the ozone generator:

1.Turn off the analyzer power, remove the power cord and the analyzer cover.

2.Disconnect the 1/8” black tube from the ozone cleanser and the ¼” clear tube from the plastic extension tube at the brass fitting nearest to the ozone generator.

3.Unplug the electrical connection on the rear side of the brick.

4.Unscrew the two mounting screws that attach the ozone generator to the chassis and take out the entire assembly.

5.If you received a complete replacement generator with circuit board and mounting bracket attached, simply reverse the above steps to replace the current generator.

Note

Ensure to carry out a leak check (11.3.12) and a recalibration after the

 

analyzer has warmed up for about 60 minutes.

12.8.3. SAMPLE AND OZONE (PERMA PURE®) DRYER REPLACEMENT

The 9110T standard configuration is equipped with a dryer for the ozone supply air. An optional dryer is available for the sample stream and a combined dryer for both gas streams can also be purchased. To change one or both of these dryers:

1.Turn off power to the analyzer and pump, remove the power cord and the analyzer cover.

2.Locate the dryers in the center of the instrument, between sensor and NO2 converter (see Figure 3-5).

They are mounted to a bracket, which can be taken out when unscrewing the two mounting screws (if necessary).

3.Disconnect all tubing that extends out of the dryer assembly.

Take extra care not to twist any of the white plastic fittings on the dryer.

Teledyne Analytical Instruments

309

Page 309
Image 309
Teledyne 9110T instruction manual 12.8.2. O3 Generator Replacement, Sample and Ozone Perma Pure Dryer Replacement