Model 9110T NOx Analyzer

 

 

 

 

 

Instrument Maintenance

 

 

 

 

Table 11-1: 9110T Maintenance Schedule

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CAL

 

 

 

DATE PERFORMED

 

 

ITEM

ACTION

FREQ

CHECK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REQ’D

 

 

 

 

 

 

 

 

 

 

 

 

TEST

Review and

Weekly

No

 

 

 

 

 

 

 

 

 

 

 

 

functions

evaluate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Particulate

Change

Weekly

No

 

 

 

 

 

 

 

 

 

 

 

 

filter

particle filter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Zero/span

Evaluate

Weekly

No

 

 

 

 

 

 

 

 

 

 

 

 

check

offset and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

slope

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Zero/span

Zero and

Every 3 months

Yes

 

 

 

 

 

 

 

 

 

 

 

 

calibration

span

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

calibration

 

 

 

 

 

 

 

 

 

 

 

 

 

 

External zero

Exchange

Every 3 months

No

 

 

 

 

 

 

 

 

 

 

 

 

air scrubber

chemical

 

 

 

 

 

 

 

 

 

 

 

 

 

 

option

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

External

Replace

When indicator

No

 

 

 

 

 

 

 

 

 

 

 

 

dryer option

chemical

color changes

 

 

 

 

 

 

 

 

 

 

 

 

 

Ozone

Change

Annually

Yes

 

 

 

 

 

 

 

 

 

 

 

 

cleanser

chemical

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Reaction cell

Clean

Annually or as

Yes

 

 

 

 

 

 

 

 

 

 

 

 

window

 

necessary

 

 

 

 

 

 

 

 

 

 

 

 

 

(“optical

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

filter” in

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 11-6)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DFU filters

Change

Annually

No

 

 

 

 

 

 

 

 

 

 

 

 

 

particle filter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pneumatic

Check for

Annually or

Yes if a

 

 

 

 

 

 

 

 

 

 

 

 

sub-system

leaks in gas

after repairs

leak is

 

 

 

 

 

 

 

 

 

 

 

 

 

flow paths

involving

repaired

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pneumatics

 

 

 

 

 

 

 

 

 

 

 

 

 

Reaction cell

Replace

Annually

Yes

 

 

 

 

 

 

 

 

 

 

 

 

O-rings &

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sintered

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

filters

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PMT Sensor

Low-level

On PMT/

Yes

 

 

 

 

 

 

 

 

 

 

 

 

Hardware

hardware

preamp

 

 

 

 

 

 

 

 

 

 

 

 

 

Calibration

calibration

changes or if

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

slope is outside

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

of 1.0±0.3

 

 

 

 

 

 

 

 

 

 

 

 

 

Pump

Rebuild head

when RCEL

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pressure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

exceeds 10 in-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hg-A (at sea

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

level)

 

 

 

 

 

 

 

 

 

 

 

 

 

Inline

Replace

Annually

No

 

 

 

 

 

 

 

 

 

 

 

 

Exhaust

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Scrubber

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO2

Replace

Every 3 years

Yes

 

 

 

 

 

 

 

 

 

 

 

 

converter

converter

or if conversion

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

efficiency drops

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

below 96%

 

 

 

 

 

 

 

 

 

 

 

 

 

Desiccant

Replace

Any time PMT

n/a

 

 

 

 

 

 

 

 

 

 

 

 

bags

 

housing is

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

opened for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

maintenance

 

 

 

 

 

 

 

 

 

 

 

 

Teledyne Analytical Instruments

240

Page 240
Image 240
Teledyne instruction manual 9110T Maintenance Schedule, CAL Date Performed Action Freq Check REQ’D