Teledyne 9110T 13.3.13.2 or 13.3.13.3 for detailed check if leak suspected, Venting

Models: 9110T

1 378
Download 378 pages 16.38 Kb
Page 61
Image 61

Model 9110TH NOx Analyzer

Getting Started

VENTING

In order to prevent back diffusion and pressure effects, both the span gas and zero air supply lines should be:

Vented outside the enclosure.

Minimum OD ¼”.

Not less than 2 meters in length.

Not greater than 10 meters in length.

EXHAUST OUTLET

 

Attach an exhaust line to the EXHAUST outlet fitting. The exhaust line should be:

 

Use PTFE tubing; minimum OD ¼”.

 

A maximum of 10 meters long.

 

Vented outside the 9110T analyzer’s enclosure

Note

Once the appropriate pneumatic connections have been made, check all

 

pneumatic fittings for leaks using the procedures defined in Sections

 

13.3.13.2 (or 13.3.13.3 for detailed check if leak suspected).

PNEUMATIC LAYOUT FOR BASIC CONFIGURATION

Teledyne Analytical Instruments

61

Page 61
Image 61
Teledyne 9110T instruction manual 13.3.13.2 or 13.3.13.3 for detailed check if leak suspected, Venting, Exhaust Outlet