LaserSpeed 8000-3 Instruction Handbook

Shutter Open

Material Present

System Ready

Nothing illuminated on gauge (i.e. Loss of Power no LED lights, and laser is off)

Power Supply Failure

Appendix E: Troubleshooting Guide

connected to User Ground (Pin 11,19,21) for the laser to turn on. Check wiring connections.

The Laser Interlock (Pin 17) must be connected to User Ground (Pin 11,19,21) for the laser to turn on. Check wiring connections.

Check setting in LaserTrak for Internal/External Material Present

Internal: Adjust Material Present threshold level until Material Present bit changes.

External Active Low: Disconnect Material Present (Pin 10), or connect to User Ground to turn Material Present On, and Connect to +5-

24VDC to turn Material Present Off.

External Active High: Disconnect Material Present (Pin 10) to turn OFF Material Presnent, and connect to +5- 24VDC to turn ON Material Present. Make sure you reference the voltage input to the User Ground (Pin 11,19,21).

System Ready bit is a combination of the Laser On, Shutter Open, and Laser At Temp status bits. These three bits must all be ON for the System Ready bit to be on.

The POWER ON Led should always be illuminated when the gauge has power. Check electrical connections, fuses, and power switch

1.Check power supply voltage

2.Replace Power Supply

Ethernet

Can't get Ethernet to work.

No Connection

Gauge doesn't have

Check the Link status light on the router to see if the connection is ok. Set the gauge's COMM LED to indicate Ethernet traffic.

Send the gauge the *ETHERNET?<CR>

Part No. 93463 / Drawing No. 0921-01561

Page 218 of 221

Revision A (Sep 2007)

Page 218
Image 218
Laser LS8000-3 manual Ethernet