Uncover the Inverter Vents

Inverter Mounting and installation

8 Step 8: After mounting and wiring the inverter, remove any covers from the inverter housing. This includes material over the side ventilation ports.

WARNING: Make sure the input power to the inverter is OFF. If the drive has been powered, leave it OFF for five minutes before continuing.

Powerup Test

Ventilation holes

(top)

Ventilation holes

(both sides)

9 Step 9: After wiring the inverter and motor, you’re ready to do a powerup test. The procedure that follows is designed for the first-time use of the drive. Please verify the following conditions before conducting the powerup test:

You have followed all the steps in this chapter up to this step.

The inverter is new, and is securely mounted to a non-flammable vertical surface.

The inverter is connected to a power source and a motor.

No additional wiring of the inverter connectors or terminals has been done.

The power supply is reliable, and the motor is a known working unit, and the motor nameplate ratings match the inverter ratings.

The motor is securely mounted, and is not connected to any load.

Goals for the Powerup Test

If there are any exceptions to the above conditions at this step, please take a moment to take any measures necessary to reach this basic starting point. The specific goals of this powerup test are:

1.Verify that the wiring to the power supply and motor is correct.

2.Demonstrate that the inverter and motor are generally compatible.

3.Get an introduction to the use of the built-in operator keypad.

The powerup test gives you an important starting to ensure a safe and successful application of the Hitachi inverter. We highly recommend performing this test before proceeding to the other chapters in this manual.