STEP 3. POWER UP V-SWITCHES

Connect the power cord to V-Switch 1 and then to the electric socket. The V-

Switch powers up. The fan assembly is running and the LCD panel displays:

V-Switch 3000

Status: OK

Connect the power cord to V-Switch 2 and then to the electric socket. The V-

Switch powers up. The fan assembly is running and the LCD panel displays:

V-Switch 3000

Status: OK

STEP 4. INITIALIZE V-SWITCH 1

Use the LCD display and control buttons on V-Switch 1 to configure the V-

Switch management port IP address and mask.

Toggle to the IP Configure ETH1 Port screen.

Press Enter. The IP Configuration screen appears.

IP CONFIG

Press Enter again. The IP Config ETH1 Port screen appears.

IP Config

ETH1 Port

Press Enter. The Insert IP screen appears.

Insert IP

0 0 0.0 0 0.0 0 0.0 0 0

Enter the management port IP address. The left/right buttons toggle between places in the IP address. The up/down buttons scroll between numbers. Press Enter after inputting the full address.

Insert IP

2 1 2.1 9 9.0 4 3.0 4 1

Press Enter to enter the IP address and progress to the IP Mask screen.

Mask

2 5 5.2 5 5.2 5 5.0 0 0

If you want to change from the default mask, use the left/right buttons to toggle between places in the mask and the up/down buttons scroll between numbers.

Press Enter to enter the IP mask and return to the main V-Switch Status screen.

V-Switch 3000

Status: OK

Sample Configurations

273

Page 280
Image 280
SANRAD V-Switch manual Sample Configurations 273