Unit Load Calculation Worksheet

7.Try to exchange modules between carriers to reduce the unit loads to

54.(Remember that the 100D, 400,400 GS/LS/TTR, 800 GS/LS-ID, 800, and 800 GS/LS modules have unit loads of 0.0.) Repeat Steps 1 through

6to recalculate unit loads for the new configuration.

If the exchange reduces the unit load to 54 or less, auxiliary power is not required.

If the exchange does not reduce the unit load to 54 or less, auxiliary power is required. Continue to Step 8.

NOTE:

Empty slots are not permitted between modules.

B-6Installation

Page 283
Image 283
AT&T 3.0 manual