Powering Up the System

Powering Up the System

CAUTION:

Follow the procedure below to power up the system only if the system is completely installed, failure to comply with this procedure can result in shock hazard or damage to the equipment.

1Turn on the power switch for each expansion carrier: start with the power supply in the rightmost carrier.

The green power lights on each expansion carrier power supply should turn

on.

2 Turn on the power switch on the basic carrier power supply.

The dot on the one-character display LED flashes.

The green light on the power supply should turn on.

The red light on the processor should turn on for 15 to 45 seconds and then turn off.

All indicators on the 100D and 400EM line/trunk modules (if present) should turn on and then off. They remain off when the modules are idle.

3If any of these conditions are not met, refer to Maintenance and Troubleshooting.

2-44Installing the Control Unit

Page 75
Image 75
AT&T 3.0 manual Powering Up the System, Turn on the power switch on the basic carrier power supply