AT&T 3.0 manual Installation IN-3

Models: 3.0

1 608
Download 608 pages 29.49 Kb
Page 290
Image 290

Index

Data stations continued configuration diagram, 6-13procedure, 6-12

MLX voice and modem data configuration diagram, 6-10procedure, 6-11

modem-only

configuration diagram, 6-9procedure, 6-8 - 6-9

overview, 6-1- 6-4video conferencing

configuration diagram, 6-18CSU settings, 6-20

data module settings, 6-20hardware required, 6-16- 6-17procedure, 6-19 - 6-20

Date, 7-3

Dial dictation device installation , 3-22- 3-24,3-25testing, 7-16

Dial-repeating tie trunks testing, 7-11 - 7-12

DID trunk testing, 7-8- 7-9DIP switch settings

400EM tie trunk module, 2-33 - 2-35AT&T 475/476 printer, 5-23- 5-24AT&T CAT printer, 5-24 - 5-25

Direct Station Selector (DSS) auxiliary power

requirements, 3-43wiring, 3-46- 3-47connection diagram, 3-45

considerations, 3-43

installation procedure, 3-43- 3-48testing, 7-15

DOS-based products supported, 8-1 - 8-2

DSS (Direct Station Selector), see Direct Station Selector (DSS)

Dual-tone multifrequency (DTMF) signaling, 3-30

E

Electrical noise, 2-3

Environmental requirements for control unit, 2-2 - 2-3

Expansion carrier, 2-26- 2-27,2-28

F

Fax machine installation, 3-22- 3-24,3-26

Ferrite core installation, 2-22 - 2-24Forms

adjunct installation, 1-3control unit installation, 1-3data equipment connection, 1-4network interface connection,

1-3 - 1-4

telephone installation, 1-3Frigid start, 7-1

Front cover, 7-22

G

General Purpose Adapter (GPA), 3-24 - 3-25 ,6-5

Ground-start (GS) button, 7-18Ground-start trunk testing, 7-8Grounding requirements, 2-5- 2-8,

2-10 - 2-15Grounds

AC, 2-10 - 2-11

central office, 2-1O- 2-1 1 Group calling delay announcement

device, 3-22 - 3-24,3-26Group Calling feature testing,

7-13 - 7-14

Installation IN–3

Page 290
Image 290
AT&T 3.0 manual Installation IN-3