Index

Overview

installation sequence, 1-1 - 1 -2programming, 1-4

adjuncts installation, 1-3control unit installation, 1-3data equipment connection, 1-4network interface connection,

1-3 - 1-4

telephone installation, 1-3system upgrade, 1-4

P

Paging connection, 3-29DTMF signaling, 3-30

multizone with background music, Magic on Hold, and bidirectional paging, 3-37

single-zone with background music and Magic on Hold, 3-36

single-zone with customer-supplied amplifier, 3-32

single-zone with PagePac Plus, 3-31single-zone with UPAM, 3-33testing, 7-16- 7-17

PassageWay Direct Connect Solution hardware and software

requirements, 8-23- 8-24overview, 8-22- 8-23

Permanent Key mode, 9-10- 9-13Personal computer (PC)

more than 50 ft. from control unit diagram, 5-6

hardware required, 5-4procedure, 5-5 - 5-7

within 50 ft. of control unit diagram, 5-3procedure, 5-2

PFT (power failure transfer) jack, see Power failure transfer (PFT) jack

Power

turning off, 2-44,9-4turning on, 2-43

Power failure transfer (PFT) jack testing, 7-18 - 7-19

Power requirements, 2-5 - 2-8Power supply installation

copper shield, 2-20 - 2-21ferrite cores, 2-22 - 2-24power supply module, 2-22ring generator, 2-19 - 2-20turning power off, 2-20

Powering down the system, 2-44 , 9-4Powering up the system, 2-43Printers

DIP switch settings applications printer, 5-25AT&T 475/476 printer, 5-23 - 5-24AT&T CAT printer, 5-24 - 5-25

more than 50 ft. from control unit adapter, 5-17- 5-21diagram, 5-18 - 5-19hardware required, 5-17- 5-18procedure, 5-19- 5-21

on outlet with CAT diagram, 5-9- 5-10hardware required, 5-9connections, 5-14 - 5-15procedure, 5-9 - 5-10

on outlet without CAT, 5-8- 5-9control unit connections,

5-12- 5-13hardware required, 5-11

options, 5-22- 5-23supported, 5-7 - 5-8

within 50 ft. of control unit, 5-16 - 5-17diagram, 5-16 - 5-17

hardware required, 5-15

IN-6Installation

Page 293
Image 293
AT&T 3.0 manual IN-6Installation