3 POSITIONING DEDICATED SIGNALS

(3)Forward rotation JOG start command (M3202+20n)/Reverse rotation JOG start command (M3203+20n) ......... Command signal

(a)JOG operation to the address increase direction is executed while forward rotation JOG start command (M3202+20n) is turning on.

When M3202+20n is turned off, a deceleration stop is executed in the deceleration time set in the parameter block.

(b)JOG operation to the address decrease direction is executed while reverse rotation JOG start command (M3203+20n) is turinig on.

When M3203+20n is turned off, a deceleration stop is executed in the deceleration time set in the parameter block.

POINT

Take an interlock so that the forward rotation JOG start command (M3202+20n) and reverse rotation JOG start command (M3203+20n) may not turn on simultaneously.

(4) Complete signal OFF command (M3204+20n)......................... Command signal

(a)This command is used to turn off the positioning start complete signal (M2400+20n) and positioning complete signal (M2401+20n).

 

Dwell time

Dwell time

 

 

 

 

t

 

ON

Positioning start

 

OFF

 

complete signal

 

(M2400+20n)

 

 

ON

 

Positioning complete

OFF

 

signal (M2401+20n)

ON

 

 

 

Complete signal OFF

OFF

 

command (M3204+20n)

 

 

 

 

 

 

 

 

 

POINT

Do not turn the complete signal OFF command on with a PLS instruction.

If it is turned on with a PLS instruction, it cannot be turned off the positioning start complete signal (M2400+20n) and the positioning complete signal (M2401+20n).

3 - 24