
10.Press firmly on the green squares on the Drum Unit until the Drum Unit clicks into place. The following figure shows how to press the Drum Unit into place.
Drum Unit
029
11.Close the Top Cover. Press down the Top Cover until a “click” is heard to ensure the cover is closed.
Top Cover
101
Installing the maintenance kit
An Installation Sheet will be provided to the customer in the
Maintenance Kit packaging.
WorkCentre Pro 665/685/765/785 |