Test the System

test tdm port-network 1

 

 

SPE B

 

 

TEST RESULTS

 

 

Port

Maintenance Name

Alt. Name Test No. Result

Error Code

PN 01A

TDM-BUS

294

PASS

 

PN 01A

TDM-BUS

296

PASS

 

PN 01A

TDM-BUS

297

ABORT

1005

PN 01B

TDM-BUS

294

PASS

 

PN 01B

TDM-BUS

296

ABORT

1005

PN 01B

TDM-BUS

297

PASS

 

Command successfully completed

Command:

Screen 8-9. Example Test Results for Time Division Multiplexing (TDM) Port Network 1

4.If the result is FAIL for any test, check the connectors of the Time Division Multiplexing (TDM) bus cables in Processor Port Network (PPN) 1.

Test Tone-Clock Boards

Testing the Tone-Clock board also detects problems with the Time Division Multiplexing (TDM) bus cables.

1.Verify the screen displays: command:

2.Type test tone-clock 1a and press ENTER.

3.Verify the screen displays test results similar to the example shown on the following page:

8-10Issue 1 September 1995

Page 120
Image 120
AT&T 555-230-894 manual Test Tone-Clock Boards, Type test tone-clock 1a and press Enter