Installation
Install queue warning indicator as follows:
1.Determine port assignment for queue warning indicator from Hunt Group Form:
EXAMPLE: Port Number | 2 | B | 02 | 01 |
|
|
|
|
|
| Cabinet | Carrier | Slot | Circuit |
|
|
|
|
|
2.Install patch cord/jumper wires at
3.Mount indicator at specified location.
4.Connect a
5.Connect red (R) and green (T) leads to the indicator.
6.Administer per DEFINITY Communications System Generic 3 V2 Implementation,
Install the 1145B1 Power Supply
The 1145B1 closet power arrangement provides an uninterruptible
During normal operation, the power supply/charger provides DC power to the load via the distribution unit while maintaining the battery in a fully charged condition. A manual switch on the distribution unit allows the user to redirect reserve power to outputs 1 through 8 or 1 through 32, with the switch set to the 1 through 32 setting, all outputs will be provided battery reserve power.
The 1145B1/1146B1 is a
Not all outputs can simultaneously provide 12 watts. The average power per output cannot exceed 6.25 watts (200/32 = 6.25). The 1145B1 is designed to power one integrated services digital network terminal or digital communications protocol adjunct per output. The maximum number of terminals or adjuncts is