Contents

 

 

Install Front Plates on Systems with

 

 

 

Earthquake Protection

4-35

 

 

Install Cabinet Clip On Systems without

 

 

 

Earthquake Protection

4-35

 

 

Figure Notes:

4-36

 

 

 

 

 

 

5

Install Telecommunications Cabling

5-1

 

Install the Cross-Connect Field

5-1

 

 

Typical Cross-Connect Field Using

 

 

 

110-Type Hardware

5-1

 

 

Figure Notes:

5-2

 

 

Hardware Installation

5-3

 

Install Cable Slack Managers

5-3

 

Route Cables from Cabinet to Cross-Connect Field

5-3

 

 

Figure Notes:

5-5

 

 

Figure Notes:

5-6

 

Connect Control Carrier Outputs Cable

5-6

 

 

Label Cables

5-7

 

Install Trunk Cables Among Network

 

 

 

Interface, Sneak Current Protector, and

 

 

 

Switch Cabinet

5-7

 

 

 

 

 

 

6

Install Generic 3 Management Terminal

6-1

 

Generic 3 Management Terminal

 

 

 

(G3-MT) Requirements

6-1

 

Connect Generic 3 Management Terminal (G3-MT)

6-2

 

 

Figure Notes:

6-4

 

Set Up G3 Management Terminal (G3-MT)

6-6

 

Remotely Connect Generic 3

 

 

 

Management Terminal (G3-MT)

6-7

 

 

Figure Notes:

6-7

 

 

 

 

 

 

7

Activate the System

7-1

 

Power Up Switch

7-2

 

 

Install Translation Flash-Memory Card

7-2

vi Issue 1 September 1995

Page 6
Image 6
AT&T 555-230-894 manual Install Telecommunications Cabling