Install and Connect the Cabinets

2.At the upper cabinet, place the top of the ground plate over the bottom of the lower-back panel so the four screws at the bottom of the lower-back panel fit through the four ground plate keyhole slots. The bottom edge of the ground plate should overlap at the top edge of the lower back panel.

3.Slide the ground plate down over the top of the upper-back panel of the lower cabinet so the four screws attaching the upper-back panel fit through the four lower ground plate slots.

4.Ensure the exposed portion of the Time Division Multiplexing (TDM) bus cable and inter-cabinet cables (ICC) do not get pinched between the cabinets.

5.Tighten all screws.

6.Repeat this procedure for each cabinet.

4-32Issue 1 September 1995

Page 72
Image 72
AT&T 555-230-894 manual