Overview and Roadmap
Install and Wire Telephones and Other
Equipment
Complete this task by following the instructions provided in Chapter 9.
NOTE:
For easier reference, installation steps and test steps are grouped in separate chapters. It may be better to install each hardware component, administer it, and then test it before going on to install another component. As an example, install the Attendant Console using the procedures in Chapter 9, "Install and Wire Telephones and Other Equipment", administer it using the procedures in "Administer the DEFINITY System According to Customer Requirements" on page
1.Make and label wiring cross connections for this customer, using provisioning plan as directed in Step 7 of Chapter 2, "Plan and Prepare the Site".
2.Install and label equipment.
3.Install the attendant consoles.
4.Install the telephones.
5.Install the trunks.
6.Install the interface for the remote management terminal (known as INADS).
7.Install the emergency transfer units and associated telephones.
8.Install external ringing.
9.Install queue warning indicator.
10.Install auxiliary power.
11.Install Basic Rate Interface (BRI) telephone, Basic Rate Interface (BRI) terminating resistor, multipoint adapter, and power adapter.
12.Install auxilliary equipment
13.Install the Processor Data Module (PDM).
14.Install the Call Management System (CMS) interface.
15.Install Property Management System (PMS).
16.Install any
17.Install Station Message Detail Recording (SMDR)/Call Detail Recording Unit (CDRU) interface.