In Figure 5-1,approximately 576 4-Pair or 768 3-Pair Station Capacity is illustrated.

Hardware Installation

These hardware installation instructions are written so one system technician can install the following equipment:

Cross-connect field

Cable slack managers

Sneak current protector (507B)

The preferred cross-connect field location is directly behind the switch cabinet.

Install Cable Slack Managers

To install the cable slack managers (Figure 5-2),proceed as follows:

1.Place the Z113A cable slack manager against the wall under the cross- connect field, aligning the left side of the cable slack manager with the first terminal block of the trunk/auxiliary field.

2.Place the next cable slack manager beside the previous cable slack manager. Align the tabs and interlocks and snap the cable slack managers together.

3.Repeat Step 2 until all cable slack managers are installed.

NOTE:

Nine holes (1/4-inch or 0.6 cm) are provided in a cable slack manager base for earthquake mounting. Also, if a cable slack manager base is mounted on an uneven floor, shims may be required to level it and insure proper fit of the covers. Holes are provided in the sides of the base for bolting cable slack managers together. Bolts and shims are not provided.

Route Cables from Cabinet to Cross-

Connect Field

Use the following guidelines when routing cables from the cabinet to the cross- connect field.

When cable routing is to the top/bottom of the cross-connect field, each port cable is connected at the cabinet and routed along the front trough of the cable slack manager to the connecting/terminal block. The cable is then terminated.

Enough slack must be left at the cabinet end of the cable to allow for proper dressing of the cables (Figure 5-3).

Issue 1 September 1995 5-3