In Figure
Hardware Installation
These hardware installation instructions are written so one system technician can install the following equipment:
■
■Cable slack managers
■Sneak current protector (507B)
The preferred
Install Cable Slack Managers
To install the cable slack managers (Figure
1.Place the Z113A cable slack manager against the wall under the cross- connect field, aligning the left side of the cable slack manager with the first terminal block of the trunk/auxiliary field.
2.Place the next cable slack manager beside the previous cable slack manager. Align the tabs and interlocks and snap the cable slack managers together.
3.Repeat Step 2 until all cable slack managers are installed.
NOTE:
Nine holes
Route Cables from Cabinet to Cross-
Connect Field
Use the following guidelines when routing cables from the cabinet to the cross- connect field.
■When cable routing is to the top/bottom of the
■Enough slack must be left at the cabinet end of the cable to allow for proper dressing of the cables (Figure
Issue 1 September 1995