Install and Connect the Cabinets

Install Back Panels

Install the back panels, tightening the screws when all panels are in place. Allow the screws labeled callout 4 in Figure 4-21 on page 4-31to remain loose.

Install Ground Plates

The ground plate (Figure 4-20)provides the ground connection for the cabinets and stabilizes the cabinets.

1

2

3

Figure Notes:

1.

Front Ground Plate

3. Back Ground Plate

2.

Battery

Side View of 2-Cabinet Port Network

Figure 4-20. Ground Plate

4-30Issue 1 September 1995

Page 70
Image 70
AT&T 555-230-894 manual Install Back Panels, Install Ground Plates