
Contents
|
| Generic 3 Management Terminal |
|
|
| ||
|
| ||
|
| Space Requirements | |
|
| Room Layout | |
|
| Figure Notes: | |
|
| Cable Slack Manager (Optional) Requirements | |
|
| Tools Needed | |
|
| Lay Out and Ensure Appropriate Power | |
|
| Power Arrangements for AC Power | |
|
| Power Arrangements for DC Power | |
| ■ Lay Out and Ensure Appropriate Grounding | ||
|
| Connect Coupled Bonding Conductor | |
| ■ Determine the Location of the Equipment Closets | ||
| ■ | Determine External Trunk Locations | |
| ■ | Create a Provisioning Plan | |
|
|
| |
|
|
| |
3 | Unpack the Cabinet | ||
|
| Unpack and Inspect for Damage | |
|
|
| |
|
|
| |
4 | Install and Connect the Cabinets | ||
| ■ | Install Earthquake Mounting | |
| ■ | Position and Stack the Cabinets | |
| ■ Connect System Cabinet Grounds | ||
|
| Figure Notes: | |
| ■ | Connect Battery Leads | |
| ■ | Connect Power | |
|
| Connect AC Power | |
|
| Connect DC Power | |
|
| Figure Notes: | |
|
| Connect Power Plant Ground | |
|
| Figure Notes: | |
|
| Connect Frame Ground | |
|
| Figure Notes: | |
|
| Connect DC Power Distribution Box Grounding |