Contents

 

 

Generic 3 Management Terminal

 

 

 

(G3-MT) Requirements

2-2

 

 

Cross-Connect Fields

2-2

 

 

Space Requirements

2-2

 

 

Room Layout

2-2

 

 

Figure Notes:

2-3

 

 

Cable Slack Manager (Optional) Requirements

2-4

 

 

Tools Needed

2-4

 

 

Lay Out and Ensure Appropriate Power

2-6

 

 

Power Arrangements for AC Power

2-6

 

 

Power Arrangements for DC Power

2-7

 

Lay Out and Ensure Appropriate Grounding

2-8

 

 

Connect Coupled Bonding Conductor

2-8

 

Determine the Location of the Equipment Closets

2-9

 

Determine External Trunk Locations

2-9

 

Create a Provisioning Plan

2-9

 

 

 

 

 

 

3

Unpack the Cabinet

3-1

 

 

Unpack and Inspect for Damage

3-1

 

 

 

 

 

 

4

Install and Connect the Cabinets

4-1

 

Install Earthquake Mounting

4-2

 

Position and Stack the Cabinets

4-2

 

Connect System Cabinet Grounds

4-3

 

 

Figure Notes:

4-4

 

Connect Battery Leads

4-5

 

Connect Power

4-6

 

 

Connect AC Power

4-6

 

 

Connect DC Power

4-6

 

 

Figure Notes:

4-8

 

 

Connect Power Plant Ground

4-9

 

 

Figure Notes:

4-9

 

 

Connect Frame Ground

4-10

 

 

Figure Notes:

4-10

 

 

Connect DC Power Distribution Box Grounding

4-11

iv Issue 1 September 1995

Page 4
Image 4
AT&T 555-230-894 manual Unpack the Cabinet