Contents

 

 

Power up AC-Powered Switch

7-3

 

 

Power up DC-Powered Switch

7-3

 

 

Verify Messages on Terminal

7-3

 

Introduction to Terminal Screens and Commands

7-4

 

 

Screens

7-4

 

 

Commands

7-5

 

 

Getting Help

7-5

 

Log in to the System

7-5

 

Set Required Country Options

7-6

 

Change Craft Password

7-9

 

Set Date and Time

7-11

 

Set System Maintenance Parameters

7-14

 

Save Translations

7-15

 

 

Logoff

7-17

 

 

 

 

 

 

8

Test the System

8-1

 

Check the System Status for Each Cabinet

8-1

 

Check Circuit Pack Configuration

8-4

 

Test Time Division Multiplexor (TDM)

 

 

 

Bus in Processor Port Network (PPN)

8-9

 

Test Tone-Clock Boards

8-10

Test Switch Processing Element (SPE)

Duplication Memory Shadowing Link

8-11

Test Duplicated Switch Processing

 

Element (SPE) Interchange

8-12

Test Expansion Interface Boards

8-14

Test Time Division Multiplexer (TDM)

 

 

for each Expansion Port Network (EPN)

8-15

Test Tone-Clock for each Expansion

Port Network (EPN)

8-16

Test Tone-Clock Interchange for each

Expansion Port Network (EPN)

8-17

Test Expansion Interface Exchange for

 

Each Expansion Port Network (EPN)

8-17

Check Circuit Pack Configuration Again

8-19

Save Translations, if Required

8-20

Issue 1 September 1995 vii

Page 7
Image 7
AT&T 555-230-894 manual Test the System